PLEASE READ ALL OF THE OWNERS MANUAL AND SAFETY NOTESIMPORTANT SAFETY NOTES:1. When installing your stove, particular attention should be paid to fire
A chimney must be the required height above the roof or other obstruction for safety and proper draft operation.The chimney must be a minimum of 3’ (9
2. THIMBLE: An approved thimble must be used when the connection from the stove is made through acombustible wall to a masonry chimney. There are se
Minimum 3 ½” (89mm) [4” (102mm) nominal] thick solid bricks are to be used. The fire clay liner(ASTM C35 or equivalent), 5/8” (16mm) wall thickness,
First, build the frame for the thimble, making sure that it is no smaller than 14½” (368mm) diameter, which willmaintain a 2” (50mm) air space around
CONNECTION TO A METAL PREFABRICATED CHIMNEYWhen a metal prefabricated chimney is used, the manufacturer’s installation instructions must be followedpr
MOBILE HOME INSTALLATIONYou must use a Quadra-Fire 4300 outside air kit (see page 16 for part numbers) for installation in a mobilehome. Use of alter
4300 PEDESTAL MODELS1. Kit includes two 1” (25mm) rope gaskets to be tucked under pedestal to seal off both sides.2. Floor installation: Cut a 4” (10
1. Place protective pad or stove pallet on floor.2. Lay body of stove on its back on protective pad or pallet.3. Slide pedestal over adapter on bot
Page 18ASH REMOVAL SYSTEM INSTALLATIONPEDESTAL MODELSLEG MODELS1. Remove ash removal system top andbottom cover plates by loosening nutsunder stove.2
ASH REMOVAL SYSTEM OPERATING AND CLEANINGCAUTION: Do not operate stove with ash removal system door open. Store ash in metal container until hotembe
Page 2TABLE OF CONTENTSSafety label ...
Page 20OPERATING INSTRUCTIONSIMPORTANT - PLEASE READ BEFORE USING STOVEBURNING PROCESSIn recent years there has been an increasing concern about air q
Page 21OPERATING INSTRUCTIONS (cont.)BLOWER OPERATING INSTRUCTIONS(see blower installation instructions on page 26)If your Quadra-Fire wood stove is e
Page 22OPERATING INSTRUCTIONS (cont.)BURNING GUIDELINES (cont.)MEDIUM: After a wood load has been burning on high for at least 15 minutes (longer for
Page 23MAINTENANCECREOSOTE1. Formation and need for removal: When wood is burned slowly, it produces tar and other organic vapors whichcombine with e
1. Remove door from stove and lay on a padded flat surface.2. Remove glass tabs and screws with a Phillips screwdriver (turn screws counterclockwise).
BRICK BAFFLEPart #832-2330 Complete Baffle Brick Set (clay)Part #832-2370 Single Baffle Brick (clay)Part #832-2380 Front Baffle SupportBaffle is
INSTALLATION OF OPTIONAL BLOWERPart #831-1700The blower is shipped fully assembled and ready for installation.1. Remove three ¼”-20 (3/8” hex head) bo
1. Unscrew and remove the rear heat deflector.2. Attach the two “S” clips to the upper edge of the outer wall of the stove.3. Set top heat shield on s
Aladdin Hearth Products, warrants their wood heating appliances to the original purchaser for the lifetime of the appliance, to be freefrom defects in
4300 SAFETY LABEL(found on back of stove)Page 3Model:Quadra-Fire4300Serial No.
28 3/8" (721mm)DIMENSIONSPage 4FIGURE 1bFIGURE 1aLEG MODELPEDESTAL MODEL
DIMENSIONS10" (245mm)2 13/16" (71mm)733STEP TOP LEG MODEL10" (254mm)2 13/16" (71mm)STEP TOP PEDESTAL MODELPage 5FIGURE 2bFIGURE 2b
CLEARANCES TO COMBUSTIBLES (UL AND ULC)Page 6FLOOR PROTECTOR: Floorprotector must be noncombustiblematerial or equivalent, extendingbeneath heater an
SAFETY LISTINGThe Quadra-Fire 4300 is safety listed by OMNI-Test Laboratories, Inc., Beaverton, Oregon, to UL 1482 andULC S627. It is also approved
CHIMNEY CONNECTORThe chimney connector must be 6” (152mm) diameter with a minimum thickness of 24 gauge. Do not usealuminum or galvanized steel. The
A chimney inside the house must have at least 2” (50mm) of clearance to the combustible structure. A chimneyoutside the house must have at least 1” (
Comments to this Manuals