www.quadrafi re.com January 3, 2007 7009-113EQuartet FrontSolitaire FrontTOPAZDIRECT VENT ROOM HEATER Owner’s ManualInstallation and Operatio
Page 10January 3, 2007Quadra-Fire · Topaz · 7009-113E5Vent InformationA. Venting ComponentsB. Use of ElbowsIn order to comply with applicable codes a
January 3, 2007Page 11Quadra-Fire · Topaz · 7009-113ED. How to Use the Vent Graph E. Venting Guidelines1. Measure the vertical distance from the cen
Page 12January 3, 2007Quadra-Fire · Topaz · 7009-113EFemale Locking LugsMale Locking LugsStep 1. Determine the desired location of the appliance. Che
January 3, 2007Page 13Quadra-Fire · Topaz · 7009-113EFigure 5.5When installing the Sapphire in a rear vent configuration with no vertical rise: a Sno
Page 14January 3, 2007Quadra-Fire · Topaz · 7009-113EStep 5. Place the wall thimble cover over the pipe assembly and slide the appliance and vent as
January 3, 2007Page 15Quadra-Fire · Topaz · 7009-113EStep 1. Check the installation instructions for required 1 in. (25mm) clearances (air space) to
Page 16January 3, 2007Quadra-Fire · Topaz · 7009-113EStep 4. Assemble the desired lengths of pipe and elbows necessary to reach from the appliance up
January 3, 2007Page 17Quadra-Fire · Topaz · 7009-113EMIN. 1 in. (25mm)CLEARANCECEILING FIRES TOPNAILSMIN. 1 in. (25mm)CLEARANCEMIN. 1 in. (25mm)CLEAR
Page 18January 3, 2007Quadra-Fire · Topaz · 7009-113E2. Cathedral CeilingLEVELCATHEDRAL CEILINGSUPPORT BOX2 in. (51mm)MIN. BELOWFINISHEDCEILINGCUT HO
January 3, 2007Page 19Quadra-Fire · Topaz · 7009-113E3. Class A Metal ChimneyFigure 5.20 HIGH WINDTERMINATIONCAPSHEET METALSCREWSDRILL FOUR 1/8 in.(
Page 2Quadra-Fire · Topaz · 7009-113E January 3, 2007Hearth & Home Technologies welcomes you to our tradition of excellence! In choosing a
Page 20January 3, 2007Quadra-Fire · Topaz · 7009-113E4. Existing Masonry ChimneyType A - Up & Out Installations for Top Vent Configurations
January 3, 2007Page 21Quadra-Fire · Topaz · 7009-113E10 in. x 10 in. (254mm x 254mm)FRAMED OPENING IN WALLSTUDWALLMASONRYCHIMNEYRETRO CONNECTORFOUR M
Page 22January 3, 2007Quadra-Fire · Topaz · 7009-113EHIGH WINDTERMINATIONCAPTOP ADAPTERTHREE SHEETMETAL SCREWSFLASHINGStep 9.Attach the flex to the r
January 3, 2007Page 23Quadra-Fire · Topaz · 7009-113E6Gas InformationA. Fuel ConversionsBefore making gas connections ensure that the appliance bein
Page 24January 3, 2007Quadra-Fire · Topaz · 7009-113EABCFigure 6.8 Turn control knob to the OFF position, ensure that gas supply to the valve has b
January 3, 2007Page 25Quadra-Fire · Topaz · 7009-113EFire Risk.Explosion Risk.• If the information in these instructions is not followed exactly, a
Page 26January 3, 2007Quadra-Fire · Topaz · 7009-113E• A small amount of air will be in the gas supply lines. When fi rst lighting appliance it will t
January 3, 2007Page 27Quadra-Fire · Topaz · 7009-113E7Electrical InformationA. Recommendation for WireC. Standing Pilot Ignition System WiringSee B
Page 28January 3, 2007Quadra-Fire · Topaz · 7009-113EFigure 7.1CAUTIONLabel all wires prior to disconnection when servicing controls. Wiring errors c
January 3, 2007Page 29Quadra-Fire · Topaz · 7009-113E8Appliance SetupA. Remove Shipping MaterialsRemove shipping materials from inside or underneath
Page 3Quadra-Fire · Topaz · 7009-113E - TABLE OF CONTENTS - January 3, 2007Section 1: Listing and Code Approvals A. Appliance Certifi cations ...
Page 30January 3, 2007Quadra-Fire · Topaz · 7009-113ED. AccessoriesInstall approved accessories per instructions included with accessories. Refer t
January 3, 2007Page 31Quadra-Fire · Topaz · 7009-113EE. Front InstallationFronts shipped attached to faceFigure 8.12 To remove the face, loosen th
Page 32January 3, 2007Quadra-Fire · Topaz · 7009-113ENOTE: Side brick panels will fit only if installed at an angle. Do not attempt to push the brick
January 3, 2007Page 33Quadra-Fire · Topaz · 7009-113EFigure 8.20 Insert locator pin into right front log. Insert rear log onto log pan over stud.
Page 34January 3, 2007Quadra-Fire · Topaz · 7009-113ENOTE: This blower utilizes a snap disc to control ON and OFF operation. When the correct temper
January 3, 2007Page 35Quadra-Fire · Topaz · 7009-113ESNAPDISC6 in. (152mm) BLACKBLOWER4 in. (102mm) WHITECORDMFMF34 in. (864mm)BLACK34 in. (864mm)WHI
Page 36January 3, 2007Quadra-Fire · Topaz · 7009-113ESee Vent Graph for Recommendations on page 11 before you begin your adjustment. If your install
January 3, 2007Page 37Quadra-Fire · Topaz · 7009-113E9Operating InstructionsA. Before Lighting ApplianceRead this entire manual prior to using the a
Page 38January 3, 2007Quadra-Fire · Topaz · 7009-113EC. Lighting Appliance1. Set the thermostat to lowest setting. 2. Turn off all electric power
January 3, 2007Page 39Quadra-Fire · Topaz · 7009-113ED. After Appliance is LitWhen you light your appliance, you may notice that it pro-duces heat w
Page 4January 3, 2007Quadra-Fire · Topaz · 7009-113E1Listing and Code ApprovalsThe product is listed to ANSI standards for “Vented Gas Appliance Heat
Page 40January 3, 2007Quadra-Fire · Topaz · 7009-113E10TroubleshootingWith proper installation, operation, and maintenance your gas appliance will pr
January 3, 2007Page 41Quadra-Fire · Topaz · 7009-113ESymptom Possible Cause Corrective Action3. (Continued) c. Defective valve. Turn the valve knob
Page 42January 3, 2007Quadra-Fire · Topaz · 7009-113E11Maintaining and Servicing Your ApplianceAlthough the frequency of your appliance servicing and
January 3, 2007Page 43Quadra-Fire · Topaz · 7009-113EInspect Maintenance TasksDoors 1. Inspect for scratches, dents or other damage and repair as ne
Page 44January 3, 2007Quadra-Fire · Topaz · 7009-113E12Reference MaterialsA. Appliance Dimension DiagramDimensions are actual appliance dimensions. U
January 3, 2007Page 45Quadra-Fire · Topaz · 7009-113EB. Vent Components DiagramFigure 12.2 SL-D Series Vent Components4 in. (102 mm) inner pipe 6-
Page 46January 3, 2007Quadra-Fire · Topaz · 7009-113EC. Vent Components List COMPONENTS930D Ceiling Support / Wall Thimble, Black941 Cathedral Ceilin
January 3, 2007Page 47Quadra-Fire · Topaz · 7009-113ED. Service Parts ListR TOPAZ(NG, LP) Exploded Parts DiagramBeginning Manuf
Page 48January 3, 2007Quadra-Fire · Topaz · 7009-113EIMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealer&ap
January 3, 2007Page 49Quadra-Fire · Topaz · 7009-113EIMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealer&ap
January 3, 2007Page 5Quadra-Fire · Topaz · 7009-113ENOTE: The following requirements reference various Massachusetts and national codes not contained
Page 50January 3, 2007Quadra-Fire · Topaz · 7009-113EOrifi ce, Pilot, NG, EZ, #62 842-4440Paint, Touch-up, Matte Black 7000-304Paint, Touch-up, Porcel
January 3, 2007Page 51Quadra-Fire · Topaz · 7009-113EPart DescriptionAlphabetical OrderPart #Blower Assembly with Speed Control (Rheostat) BK-GASDeco
Page 52January 3, 2007Quadra-Fire · Topaz · 7009-113EF. Warranty PolicyLifetime WarrantyRLIMITED LIFETIME WARRANTYThe Hearth & Home Technologies
January 3, 2007Page 53Quadra-Fire · Topaz · 7009-113ETHIS PAGE INTENTIONALLY LEFT BLANK.
Page 54January 3, 2007Quadra-Fire · Topaz · 7009-113ETHIS PAGE INTENTIONALLY LEFT BLANK.
January 3, 2007Page 55Quadra-Fire · Topaz · 7009-113ETHIS PAGE INTENTIONALLY LEFT BLANK.
Page 56Quadra-Fire · Topaz · 7009-113E January 3, 2007Hearth & Home Technologies1445 North HighwayColville, WA 99114Division of HHT INDUST
Page 6January 3, 2007Quadra-Fire · Topaz · 7009-113E2Getting StartedCheck building codes prior to installation.• Installation MUST comply with local
January 3, 2007Page 7Quadra-Fire · Topaz · 7009-113E3Appliance Location and ClearancesA. Selecting Appliance LocationNOTE: · Illustrations refl ect t
Page 8January 3, 2007Quadra-Fire · Topaz · 7009-113E4Termination LocationsA. Vent Termination Minimum Clearances24 in. (610mm)(minimum) toPerpendicul
January 3, 2007Page 9Quadra-Fire · Topaz · 7009-113EFigure 4.4 V= VENT TERMINALX= AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTEDA = 12 inc
Comments to this Manuals